225 west 106th street

 
 

the materials involved include the following

  • drop ceiling: faced with muntz metal.

  • lighting: six (6) l.e.d down light system.

  • wall panels: faced with plastic laminate. all the panels are running vertical & held in place with aluminum z-clips.

  • handrail: one (1) faced with stainless steel.

  • reveals, base, & fronts: faced with muntz metal.

  • floor: faced with fritz tile flooring.