225 west 106th street
the materials involved include the following
drop ceiling: faced with muntz metal.
lighting: six (6) l.e.d down light system.
wall panels: faced with plastic laminate. all the panels are running vertical & held in place with aluminum z-clips.
handrail: one (1) faced with stainless steel.
reveals, base, & fronts: faced with muntz metal.
floor: faced with fritz tile flooring.